Publications

Results 51–75 of 93
Skip to search filters

Photovoltaic Microinverter Testbed for Multiple Device Interoperability

Quiroz, Jimmy E.; Gonzalez, Sigifredo G.; King, Bruce H.; Riley, Daniel R.; Johnson, Jay; Stein, Joshua S.

IEEE Standard 1547-2003 [1] conformance of several interconnected microinverters was performed by Sandia National Laboratories (SNL) to determine if there were emergent adverse behaviors of co-located aggregated distributed energy resources. Experiments demonstrated the certification tests could be expanded for multi- manufacturer microinverter interoperability. Evaluations determined the microinverters' response to abnormal conditions in voltage and frequency, interruption in grid service, and cumulative power quality. No issues were identified to be caused by the interconnection of multiple devices.

More Details

Effect of non-unity power factor operation in photovoltaic inverters employing grid support functions

2014 IEEE 40th Photovoltaic Specialist Conference, PVSC 2014

Gonzalez, Sigifredo G.; Neely, Jason; Ropp, Michael

The high penetration of utility-interconnected photovoltaic systems is causing heightened concern over the effect that variable renewable generation will have on the electric power system (EPS). These concerns have initiated the need to amend the utility interconnection standard to allow functionalities, so-called advanced inverter functions, to minimize the negative impact these variable distributed energy resources may have on EPS voltage and frequency. Unfortunately, advanced functions, in particular volt-VAr, will result in non-unity power factor (PF) operation[3]. The increased phase current results in additional conduction losses and switching losses in the inverter power electronics. These power losses have a direct impact on real power delivered to the grid at the point of common coupling (PCC) and an impact on inverter service life. This report provides analysis, simulation, and experimental evidence to investigate the effect of advanced inverter functions on non-unity PF operation.

More Details

Accelerating development of advanced inverters :

Neely, Jason C.; Gonzalez, Sigifredo G.

The high penetration of utility interconnected photovoltaic (PV) systems is causing heightened concern over the effect that variable renewable generation will have on the electrical power system (EPS). These concerns have initiated the need to amend the utility interconnection standard to allow advanced inverter control functionalities that provide: (1) reactive power control for voltage support, (2) real power control for frequency support and (3) better tolerance of grid disturbances. These capabilities are aimed at minimizing the negative impact distributed PV systems may have on EPS voltage and frequency. Unfortunately, these advanced control functions may interfere with island detection schemes, and further development of advanced inverter functions requires a study of the effect of advanced functions on the efficacy of antiislanding schemes employed in industry. This report summarizes the analytical, simulation and experimental work to study interactions between advanced inverter functions and anti-islanding schemes being employed in distributed PV systems.

More Details

Development of economically viable, highly integrated, highly modular SEGIS architecture

Gonzalez, Sigifredo G.; Kuszmaul, Scott S.; David, Caroline K.; Sena-Carian, Lisa D.

Initiated in 2008, the SEGIS initiative is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the initiative have focused on the complete-system development of solar technologies, with the dual goal of expanding renewable PV applications and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. Petra Solar, Inc., a New Jersey-based company, received SEGIS funds to develop solutions to two of these key challenges: integrating increasing quantities of solar resources into the grid without compromising (and likely improving) power quality and reliability, and moving the design from a concept of intelligent system controls to successful commercialization. The resulting state-of-the art technology now includes a distributed photovoltaic (PV) architecture comprising AC modules that not only feed directly into the electrical grid at distribution levels but are equipped with new functions that improve voltage stability and thus enhance overall grid stability. This integrated PV system technology, known as SunWave, has applications for 'Power on a Pole,' and comes with a suite of technical capabilities, including advanced inverter and system controls, micro-inverters (capable of operating at both the 120V and 240V levels), communication system, network management system, and semiconductor integration. Collectively, these components are poised to reduce total system cost, increase the system's overall value and help mitigate the challenges of solar intermittency. Designed to be strategically located near point of load, the new SunWave technology is suitable for integration directly into the electrical grid but is also suitable for emerging microgrid applications. SunWave was showcased as part of a SEGIS Demonstration Conference at Pepco Holdings, Inc., on September 29, 2011, and is presently undergoing further field testing as a prelude to improved and expanded commercialization.

More Details

Advanced Energy Industries, Inc. SEGIS developments

Gonzalez, Sigifredo G.; Kuszmaul, Scott S.; David, Caroline K.; Sena-Carian, Lisa D.

The Solar Energy Grid Integration Systems (SEGIS) initiative is a three-year, three-stage project that includes conceptual design and market analysis (Stage 1), prototype development/testing (Stage 2), and commercialization (Stage 3). Projects focus on system development of solar technologies, expansion of intelligent renewable energy applications, and connecting large-scale photovoltaic (PV) installations into the electric grid. As documented in this report, Advanced Energy Industries, Inc. (AE), its partners, and Sandia National Laboratories (SNL) successfully collaborated to complete the final stage of the SEGIS initiative, which has guided new technology development and development of methodologies for unification of PV and smart-grid technologies. The combined team met all deliverables throughout the three-year program and commercialized a broad set of the developed technologies.

More Details

Solar energy grid integration systems : final report of the Florida Solar Energy Center Team

Gonzalez, Sigifredo G.; Sena-Carian, Lisa D.; David, Caroline K.

Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

More Details

Solar Energy Grid Integration Systems. Final Report of the Princeton Power Systems Development of the 100kW Demand Response Inverter

Gonzalez, Sigifredo G.; Sena-Carian, Lisa D.; David, Caroline K.

Initiated in 2008, the Solar Energy Grid Integration (SEGIS) program is a partnership involving the U.S. Department of Energy, Sandia National Laboratories, electric utilities, academic institutions and the private sector. Recognizing the need to diversify the nation's energy portfolio, the SEGIS effort focuses on specific technologies needed to facilitate the integration of large-scale solar power generation into the nation's power grid Sandia National Laboratories (SNL) awarded a contract to Princeton Power Systems, Inc., (PPS) to develop a 100kW Advanced AC-link SEGIS inverter prototype under the Department of Energy Solar Energy Technologies Program for near-term commercial applications. This SEGIS initiative emphasizes the development of advanced inverters, controllers, communications and other balance-of-system components for photovoltaic (PV) distributed power applications. The SEGIS Stage 3 Contract was awarded to PPS on July 28, 2010. PPS developed and implemented a Demand Response Inverter (DRI) during this three-stage program. PPS prepared a 'Site Demonstration Conference' that was held on September 28, 2011, to showcase the cumulative advancements. This demo of the commercial product will be followed by Underwriters Laboratories, Inc., certification by the fourth quarter of 2011, and simultaneously the customer launch and commercial production sometime in late 2011 or early 2012. This final report provides an overview of all three stages and a full-length reporting of activities and accomplishments in Stage 3.

More Details
Results 51–75 of 93