Publications

Results 26–32 of 32
Skip to search filters

Contingency Contractor Optimization Phase 3 Extension Quick Start Guide Contingency Contractor Optimization Tool - Engineering Prototype - Release 2.3

Bandlow, Alisa B.; Bandlow, Alisa B.; Adair, Kristin L.; Adair, Kristin L.; Durfee, Justin D.; Durfee, Justin D.; Frazier, Christopher R.; Frazier, Christopher R.; Gearhart, Jared L.; Gearhart, Jared L.; Nozick, Linda K.; Nozick, Linda K.

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

More Details

Contingency Contractor Optimization Phase 3 Extension User Manual Contingency Contractor Optimization Tool - Engineering Prototype - Release 2.3

Bandlow, Alisa B.; Bandlow, Alisa B.; Adair, Kristin L.; Adair, Kristin L.; Durfee, Justin D.; Durfee, Justin D.; Frazier, Christopher R.; Frazier, Christopher R.; Gearhart, Jared L.; Gearhart, Jared L.; Nozick, Linda K.; Nozick, Linda K.

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo [1] and DoDI 3020.41 [2] by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

More Details

Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2

Bandlow, Alisa B.; Adair, Kristin L.; Durfee, Justin D.; Frazier, Christopher R.; Gearhart, Jared L.; Nozick, Linda K.

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo [1] and DoDI 3020.41 [2] by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

More Details

Contingency Contractor Optimization Phase 3 Quick Start Guide Contingency Contractor Optimization Tool Prototype - Release 2.2

Bandlow, Alisa B.; Adair, Kristin L.; Durfee, Justin D.; Frazier, Christopher R.; Gearhart, Jared L.; Nozick, Linda K.

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

More Details

Optimizing the Configuration of Sensor Networks to Detect Intruders

Sandia journal manuscript; Not yet accepted for publication

Brown, Nathanael J.; Jones, Katherine A.; Nozick, Linda K.; Xu, Ningxiong X.

This paper focuses on optimizing the selection and configuration of detection technologies to protect a target of interest. The ability of an intruder to simply reach the target is assumed to be sufficient to consider the security system a failure. To address this problem, we develop a game theoretic model of the strategic interactions between the system owner and a knowledgeable intruder. A decomposition-based exact method is used to solve the resultant model.

More Details
Results 26–32 of 32
Results 26–32 of 32