RECOMMENDATIONS FOR RCD GROUND FAULT DETECTOR TRIP THRESHOLDS
Abstract not provided.
Abstract not provided.
Abstract not provided.
Journal of Photovoltaics
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The power output variability of photovoltaic systems can affect local electrical grids in locations with high renewable energy penetrations or weak distribution or transmission systems. In those rare cases, quick controllable generators (e.g., energy storage systems) or loads can counteract the destabilizing effects by compensating for the power fluctuations. Previously, control algorithms for coordinated and uncoordinated operation of a small natural gas engine-generator (genset) and a battery for smoothing PV plant output were optimized using MATLAB/Simulink simulations. The simulations demonstrated that a traditional generation resource such as a natural gas genset in combination with a battery would smooth the photovoltaic output while using a smaller battery state of charge (SOC) range and extending the life of the battery. This paper reports on the experimental implementation of the coordinated and uncoordinated controllers to verify the simulations and determine the differences in the controllers. The experiments were performed with the PNM PV and energy storage Prosperity site and a gas engine-generator located at the Aperture Center at Mesa Del Sol in Albuquerque, New Mexico. Two field demonstrations were performed to compare the different PV smoothing control algorithms: (1) implementing the coordinated and uncoordinated controls while switching off a subsection of the PV array at precise times on successive clear days, and (2) comparing the results of the battery and genset outputs for the coordinated control on a high variability day with simulations of the coordinated and uncoordinated controls. It was found that for certain PV power profiles the SOC range of the battery may be larger with the coordinated control, but the total amp-hours through the battery-which approximates battery wear-will always be smaller with the coordinated control.
Abstract not provided.
Abstract not provided.
Distributed energy resources (DER) such as photovoltaic (PV) systems, when deployed in a large scale, are capable of influencing significantly the operation of power systems. Looking to the future, stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. In 2009, the Electric Power Research Institute (EPRI), Sandia National Laboratories (SNL) with the U.S. Department of Energy (DOE), and the Solar Electric Power Association (SEPA) initiated a large industry collaborative to identify and standardize definitions for a set of DER grid support functions. While the initial effort concentrated on grid-tied PV inverters and energy storage systems, the concepts have applicability to all DER. A partial product of this on-going effort is a reference definitions document (IEC TR 61850-90-7, Object models for power converters in distributed energy resources (DER) systems) that has become a basis for expansion of related International Electrotechnical Commission (IEC) standards, and is supported by US National Institute of Standards and Technology (NIST) Smart Grid Interoperability Panel (SGIP). Some industry-led organizations advancing communications protocols have also embraced this work. As standards continue to evolve, it is necessary to develop test protocols to independently verify that the inverters are properly executing the advanced functions. Interoperability is assured by establishing common definitions for the functions and a method to test compliance with operational requirements. This document describes test protocols developed by SNL to evaluate the electrical performance and operational capabilities of PV inverters and energy storage, as described in IEC TR 61850-90-7. While many of these functions are not now required by existing grid codes or may not be widely available commercially, the industry is rapidly moving in that direction. Interoperability issues are already apparent as some of these inverter capabilities are being incorporated in large demonstration and commercial projects. The test protocols are intended to be used to verify acceptable performance of inverters within the standard framework described in IEC TR 61850-90-7. These test protocols, as they are refined and validated over time, can become precursors for future certification test procedures for DER advanced grid support functions.
Sandia National Laboratories has created a test protocol for IEC TR 61850-90-7 advanced distributed energy resource (DER) functions, titled "Test Protocols for Advanced Inverter Interoperability Functions," often referred to as the Sandia Test Protocols. This document is currently in draft form, but has been shared with stakeholders around the world with the ultimate goal of collaborating to create a consensus set of test protocols which can be then incorporated into an International Electrotechnical Commission (IEC) and/or Underwriters Laboratories (UL) certification standard. The protocols are designed to ensure functional interoperability of DER (primarily photovoltaic (PV) inverters and energy storage systems) as specified by the IEC technical report through communication and electrical tests. In this report, Sandia exercises the electrical characterization portion of the test protocols for four functions: constant power factor (INV3), volt-var (VV11), frequency-watt (FW21), and Low and High Voltage Ride Through (L/HVRT). The goal of the tests reported here was not to characterize the performance of the equipment under test (EUT), but rather to (a) exercise the draft Sandia Test Protocols in order to identify any revisions needed in test procedures, conditions, or equipment and (b) gain experience with state-of-the-art DER equipment to determine if the tests put unrealistic or overly aggressive requirements on EUT operation. In performing the work according to the current versions of the protocols, Sandia was able to identify weaknesses in the current versions and suggest improvements to the test protocols.
Distributed energy resources (DER) such as photovoltaic (PV) systems, when deployed in a large scale, are capable of influencing significantly the operation of power systems. Looking to the future, stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. In 2009, the Electric Power Research Institute (EPRI), Sandia National Laboratories (SNL) with the U.S. Department of Energy (DOE), and the Solar Electric Power Association (SEPA) initiated a large industry collaborative to identify and standardize definitions for a set of DER grid support functions. While the initial effort concentrated on grid-tied PV inverters and energy storage systems, the concepts have applicability to all DER. A partial product of this on-going effort is a reference definitions document (IEC TR 61850-90-7, Object models for power converters in distributed energy resources (DER) systems) that has become a basis for expansion of related International Electrotechnical Commission (IEC) standards, and is supported by US National Institute of Standards and Technology (NIST) Smart Grid Interoperability Panel (SGIP). Some industry-led organizations advancing communications protocols have also embraced this work. As standards continue to evolve, it is necessary to develop test protocols to independently verify that the inverters are properly executing the advanced functions. Interoperability is assured by establishing common definitions for the functions and a method to test compliance with operational requirements. This document describes test protocols developed by SNL to evaluate the electrical performance and operational capabilities of PV inverters and energy storage, as described in IEC TR 61850-90-7. While many of these functions are not currently required by existing grid codes or may not be widely available commercially, the industry is rapidly moving in that direction. Interoperability issues are already apparent as some of these inverter capabilities are being incorporated in large demonstration and commercial projects. The test protocols are intended to be used to verify acceptable performance of inverters within the standard framework described in IEC TR 61850-90-7. These test protocols, as they are refined and validated over time, can become precursors for future certification test procedures for DER advanced grid support functions.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
While the 2011 National Electrical Codeª (NEC) only requires series arc-fault protection, some arc-fault circuit interrupter (AFCI) manufacturers are designing products to detect and mitigate both series and parallel arc-faults. Sandia National Laboratories (SNL) has extensively investigated the electrical differences of series and parallel arc-faults and has offered possible classification and mitigation solutions. As part of this effort, Sandia National Laboratories has collaborated with MidNite Solar to create and test a 24-string combiner box with an AFCI which detects, differentiates, and de-energizes series and parallel arc-faults. In the case of the MidNite AFCI prototype, series arc-faults are mitigated by opening the PV strings, whereas parallel arc-faults are mitigated by shorting the array. A range of different experimental series and parallel arc-fault tests with the MidNite combiner box were performed at the Distributed Energy Technologies Laboratory (DETL) at SNL in Albuquerque, NM. In all the tests, the prototype de-energized the arc-faults in the time period required by the arc-fault circuit interrupt testing standard, UL 1699B. The experimental tests confirm series and parallel arc-faults can be successfully mitigated with a combiner box-integrated solution.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Ground faults in photovoltaic (PV) systems pose a fire and shock hazard. To mitigate these risks, AC-isolated, DC grounded PV systems in the United States use Ground Fault Protection Devices (GFPDs), e.g., fuses, to de-energize the PV system when there is a ground fault. Recently the effectiveness of these protection devices has come under question because multiple fires have started when ground faults went undetected. In order to understand the limitations of fuse-based ground fault protection in PV systems, analytical and numerical simulations of different ground faults were performed. The numerical simulations were conducted with Simulation Program with Integrated Circuit Emphasis (SPICE) using a circuit model of the PV system which included the modules, wiring, switchgear, grounded or ungrounded components, and the inverter. The derivation of the SPICE model and the results of parametric fault current studies are provided with varying array topologies, fuse sizes, and fault impedances. Closed-form analytical approximations for GFPD currents from faults to the grounded current carrying conductor-known as %E2%80%9Cblind spot%E2%80%9D ground faults-are derived to provide greater understanding of the influence of array impedances on fault currents. The behavior of the array during various ground faults is studied for a range of ground fault fuse sizes to determine if reducing the size of the fuse improves ground fault detection sensitivity. The results of the simulations show that reducing the amperage rating of the protective fuse does increase fault current detection sensitivity without increasing the likelihood of nuisance trips to a degree. Unfortunately, this benefit reaches a limit as fuses become smaller and their internal resistance increases to the point of becoming a major element in the fault current circuit.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Conference Record of the IEEE Photovoltaic Specialists Conference
To improve fire safety in PV systems, Article 690.11 of the 2011 National Electrical Code (NEC) requires photovoltaic (PV) systems above 80 V on or penetrating a building to include a listed arc-fault protection device. Many arc-fault circuit interrupter (AFCI) devices are currently being listed and entering the market. Depending on the manufacturer, AFCIs are being deployed at the module-level, string-level, or array-level. Each arc-fault protection scheme has a different cost and arc-fault isolation capability. Module-level and string-level AFCI devices tout the ability to isolate the fault, identify the failed PV component, and minimize the power loss by selectively de-energizing a portion of the array. However, these benefits are negated if the arcing noisetypically used for arc-fault detectionpropagates to parallel, unfaulted strings and cause additional AFCI devices on the PV array to trip. If the arcing signature crosstalks from the string with the arc-fault via conduction or RF electromagnetic coupling, the location of the arc-fault cannot be easily determined and safe PV generators will be disconnected. Sandia National Laboratories collaborated with Texas Instruments to perform a series of nuisance trip scenarios with different PV configurations. Experimental results on a 2-string array showed arc detection on the faulted string occurred an average of 19.5 ms before unfaulted stringbut in some cases the AFCI on both strings would trip. © 2012 IEEE.
Conference Record of the IEEE Photovoltaic Specialists Conference
The 2011 National Electrical Code® Article 690.11 requires photovoltaic systems on or penetrating a building to include a DC arc-fault protection device. In order to satisfy this requirement, new Arc-Fault Detectors (AFDs) are being developed by multiple manufacturers including Sensata Technologies. Arc-fault detection algorithms often utilize the AC noise on the PV string to determine when arcing conditions exist in the DC system. In order to accelerate the development and testing of Sensata Technologies' arc-fault detection algorithm, Sandia National Laboratories (SNL) provided a number of data sets. These prerecorded 10 MHz baseline and arc-fault data sets included different inverter and arc-fault noise signatures. Sensata Technologies created a data evaluation method focused on regeneration of the prerecorded arcing and baseline test data with an arbitrary function generator, thereby reducing AFD development time. © 2012 IEEE.
Conference Record of the IEEE Photovoltaic Specialists Conference
The 2011 National Electrical Code® requires PV DC series arc-fault protection but does not require parallel arc-fault protection. As a result, manufacturers are creating arc-fault circuit interrupters (AFCIs) which only safely de-energize the arcing circuit when a series arc-fault occurs. Since AFCI devices often use the broadband AC noise on the DC side of the PV system for detection and series and parallel arc-faults create similar frequency content, it is likely an AFCI device will open in the event of either arc-fault type. In the case of parallel arc-faults, opening the AFCI will not extinguish the arc and may make the arc worse, potentially creating a fire. Due to the fire risk from parallel arc-faults, Tigo Energy and Sandia National Laboratories studied series and parallel arc-faults and confirmed the noise signatures from the two arc-faults types are nearly identical. As a result, three alternative methods for differentiating parallel and series arc-faults are presented along with suggestions for arc-fault mitigation of each arc-fault type. © 2012 IEEE.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.