IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

Harris, James M.; Huelskamp, Robert M.

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

More Details

IDC Integrated Master Plan

Clifford, David J.; Harris, James M.

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

More Details

US NDC Modernization: Service Oriented Architecture Study Status

Hamlet, Benjamin R.; Encarnacao, Andre V.; Harris, James M.; Young, Christopher J.

This report is a progress update on the USNDC Modernization Service Oriented Architecture (SOA) study describing results from Inception Iteration 1, which occurred between October 2012 and March 2013. The goals during this phase are 1) discovering components of the system that have potential service implementations, 2) identifying applicable SOA patterns for data access, service interfaces, and service orchestration/choreography, and 3) understanding performance tradeoffs for various SOA patterns

More Details

US NDC Modernization: Service Oriented Architecture Proof of Concept

Hamlet, Benjamin R.; Encarnacao, Andre V.; Jackson, Keilan R.; Hays, Ian A.; Barron, Nathan E.; Simon, Luke B.; Harris, James M.; Young, Christopher J.

This report is a progress update on the US NDC Modernization Service Oriented Architecture (SOA) study describing results from a proof of concept project completed from May through September 2013. Goals for this proof of concept are 1) gain experience configuring, using, and running an Enterprise Service Bus (ESB), 2) understand the implications of wrapping existing software in standardized interfaces for use as web services, and 3) gather performance metrics for a notional seismic event monitoring pipeline implemented using services with various data access and communication patterns. The proof of concept is a follow on to a previous SOA performance study. Work was performed by four undergraduate summer student interns under the guidance of Sandia staff.

More Details

IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case)

Harris, James M.; Prescott, Ryan M.; Dawson, Jericah M.; Huelskamp, Robert M.

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

More Details

Cyber threat metrics

Mateski, Mark E.; Trevino, Cassandra M.; Veitch, Cynthia K.; Michalski, John T.; Harris, James M.; Maruoka, Les S.; Frye, Jason N.

Threats are generally much easier to list than to describe, and much easier to describe than to measure. As a result, many organizations list threats. Fewer describe them in useful terms, and still fewer measure them in meaningful ways. This is particularly true in the dynamic and nebulous domain of cyber threats - a domain that tends to resist easy measurement and, in some cases, appears to defy any measurement. We believe the problem is tractable. In this report we describe threat metrics and models for characterizing threats consistently and unambiguously. The purpose of this report is to support the Operational Threat Assessment (OTA) phase of risk and vulnerability assessment. To this end, we focus on the task of characterizing cyber threats using consistent threat metrics and models. In particular, we address threat metrics and models for describing malicious cyber threats to US FCEB agencies and systems.

More Details

Geotech Smart24 data acquisition system input terminated noise seismic response adjusted test : StreckeisenSTS2-low and high gain, Guralp CMG3T and Geotech GS13 seismometers

Rembold, Randy K.; Harris, James M.

Sandia National Laboratories has tested, evaluated and reported on the Geotech Smart24 data acquisition system with active Fortezza crypto card data signing and authentication in SAND2008-. One test, Input Terminated Noise, allows us to characterize the self-noise of the Smart24 system. By computing the power spectral density (PSD) of the input terminated noise time series data set and correcting for the instrument response of different seismometers, the resulting spectrum can be compared to the USGS new low noise model (NLNM) of Peterson (1996), and determine the ability of the matched system of seismometer and Smart24 to be quiet enough for any general deployment location. Four seismometer models were evaluated: the Streckeisen STS2-Low and High Gain, Guralp CMG3T and Geotech GS13 models. Each has a unique pass-band as defined by the frequency band of the instrument corrected noise spectrum that falls below the new low-noise model.

More Details

Test definitions for the evaluation of digital waveform recorders

Hart, Darren H.; Harris, James M.

This Test Definition for the Evaluation of Digitizing Waveform Recorders (DWR) defines the process that can be performed as part of the evaluation and testing of geophysical sensors, digitizers, sensor subsystems and geophysical station/array systems. The objectives are to (1) evaluate the overall technical performance of the DWR, measure the distortions introduced by the high resolution digitizers and provide a performance check of the internal calibrator if provided and (2) evaluate the technical performance of the DWR for a specific sensor application. The results of these evaluations can be compared to the manufacturer's specifications and any relevant application requirements or specifications.