Enhanced Data Authentication System (EDAS): Concept Demonstration and Applications
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
To ensure the peaceful intent for production and processing of nuclear fuel, verifiable process monitoring of the fuel production cycle is required. As part of a U.S. Department of Energy (DOE)-EURATOM collaboration in the field of international nuclear safeguards, the DOE Sandia National Laboratories (SNL), the European Commission Joint Research Centre (JRC) and Directorate General-Energy (DG-ENER) developed and demonstrated a new concept in process monitoring, enabling the use of operator process information by branching a second, authenticated data stream to the Safeguards inspectorate. This information would be complementary to independent safeguards data, improving the understanding of the plant's operation. The concept is called the Enhanced Data Authentication System (EDAS). EDAS transparently captures, authenticates, and encrypts communication data that is transmitted between operator control computers and connected analytical equipment utilized in nuclear processes controls. The intent is to capture information as close to the sensor point as possible to assure the highest possible confidence in the branched data. Data must be collected transparently by the EDAS: Operator processes should not be altered or disrupted by the insertion of the EDAS as a monitoring system for safeguards. EDAS employs public key authentication providing 'jointly verifiable' data and private key encryption for confidentiality. Timestamps and data source are also added to the collected data for analysis. The core of the system hardware is in a security enclosure with both active and passive tamper indication. Further, the system has the ability to monitor seals or other security devices in close proximity. This paper will discuss the EDAS concept, recent technical developments, intended application philosophy and the planned future progression of this system.
Abstract not provided.
Abstract not provided.
Abstract not provided.