Publications

4 Results
Skip to search filters

LANL MLU TRUPACT Loading Survey Document

Allardice, Amber M.; Walton, Edward E.; Bowman, Brian B.; Kegeler, Stephen A.; Martinez, Daniel C.; Molina, Vanessa M.; Rollins, Andrew R.; Tafoya, David S.

The following SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment being performed by the LANL MLU team. The survey was performed in TA-5, on October 19th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

More Details

LANL MLU Incoming TRUPACT Trailer Document

Allardice, Amber M.; Bowman, Brian B.; Rollins, Andrew R.; Kegeler, Stephen A.; Molina, Vanessa M.; Tafoya, David S.

This SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment being performed by the LANL MLU team. The survey was performed in TA-5, on October 6th, 2021. This survey was of two WIPP trailers carrying three empty TRUPACTs each.

More Details

LANL MLU 20 October TRUPACT Loading Survey Document

Allardice, Amber M.; Walton, Edward E.; Bowman, Brian B.; Kegeler, Stephen A.; Martinez, Daniel C.; Molina, Vanessa M.; Rollins, Andrew R.; Tafoya, David S.

This SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment performed by the LANL MLU team on October 20th. The survey was performed in TA-5, on October 20th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

More Details

WIPP MLU Incoming Vehicles Survey Document

Rollins, Andrew R.; Walton, Edward E.; Kegeler, Stephen A.; Brasure, Ryan W.

The following SNL document contains requested radiological survey information, as part of the documentation for the TRU-waste shipment being performed by the LANL MLU team. The surveys were performed in TA-5, on July 20th, 2020: Incoming WIPP TRU-Pact trailers survey: 1-20200720-4, and, Incoming MLU trailer and mobile crane survey: 1-20200720-8 The first survey was of 2 WIPP trailers carrying 2 empty TRU Half-Pacts each. The second survey was for a trailer with the MLU team's equipment, and for the contracted mobile crane that be used for loading Half-Pacts. All information contained was completed, reviewed, and approved by SNL RP personnel, and is released for receipt and use by the LANL MLU Team and WIPP personnel at their discretion.

More Details
4 Results
4 Results