Publications

5 Results
Skip to search filters

The Integration Process for Incorporating Nuclear Explosion Monitoring Research Results into the National Nuclear Security Administration Knowledge Base

Gallegos, David P.; Carr, Dorthe B.; Herrington, Preston B.; Harris, James M.

The process of developing the National Nuclear Security Administration (NNSA) Knowledge Base (KB) must result in high-quality Information Products in order to support activities for monitoring nuclear explosions consistent with United States treaty and testing moratoria monitoring missions. The validation, verification, and management of the Information Products is critical to successful scientific integration, and hence, will enable high-quality deliveries to be made to the United States National Data Center (USNDC) at the Air Force Technical Applications Center (AFTAC). As an Information Product passes through the steps necessary to become part of a delivery to AFTAC, domain experts (including technical KB Working Groups that comprise NNSA and DOE laboratory staff and the customer) will provide coordination and validation, where validation is the determination of relevance and scientific quality. Verification is the check for completeness and correctness, and will be performed by both the Knowledge Base Integrator and the Scientific Integrator with support from the Contributor providing two levels of testing to assure content integrity and performance. The Information Products and their contained data sets will be systematically tracked through the integration portion of their life cycle. The integration process, based on lessons learned during its initial implementations, is presented in this report.

More Details

Certification of U.S. International Monitoring System Stations

Herrington, Preston B.; Rembold, Randy K.; Harris, James M.; Kromer, Richard P.; Harris, James M.

All stations planned for the International Monitoring System (IMS) must be certified by the Provisional Technical Secretariat (PTS) prior to acceptance to ensure that the monitoring stations initially meet the required specifications. Working Group B of the Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty has established requirements for the quality, availability, and surety of data received at the International Data Centre (IDC). These requirements are verified by the PTS during a 3-component process that includes initial station assessment, testing and evaluation, and certification. Sandia National Laboratories has developed procedures, facilities, and tools that can be used to assist in evaluating IMS stations for compliance with certification requirements. System evaluation includes station design reviews, component testing, and operational testing of station equipment. Station design is evaluated for security and reliability considerations, and to ensure that operational procedures and documentation are adequate. Components of the station are tested for compliance with technical specifications, such as timing and noise levels of sampled data, and monitoring of tamper detection equipment. Data sent from the station in an IMS-standard format (CD-1 or IMS-1) are analyzed for compliance with the specified protocol and to ensure that the station data (sensor and state-of-health) are accurately transmitted. Data availability and authentication statistics are compiled and examined for problems.

More Details
5 Results
5 Results