Generalized Blockmodeling of Multi-Valued Networks
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options, resulting in scores. SCORE factors extend this capability by providing estimates of complexity relative to a base system (i.e., all design options are normalized to one weapon system). First, a clearly defined set of scope elements for a warhead option is established. The complexity of each scope element is estimated by Subject Matter Experts (SMEs), including a level of uncertainty, relative to a specific reference system. When determining factors, complexity estimates for a scope element can be directly tied to the base system or chained together via comparable scope elements in a string of reference systems that ends with the base system. The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA-12 led Enterprise Modeling and Analysis Consortium (EMAC). Historically, it has provided the data elicitation, integration, and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).
The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).
Abstract not provided.
Transportation Research Record
This paper presents a probabilistic origin-destination table for waterborne containerized imports. The analysis makes use of 2012 Port Import/Export Reporting Service data, 2012 Surface Transportation Board waybill data, a gravity model, and information on the landside transportation mode split associated with specifc ports. This analysis suggests that about 70% of the origin-destination table entries have a coeffcient of variation of less than 20%. This 70% of entries is associated with about 78% of the total volume. This analysis also makes evident the importance of rail interchange points in Chicago, Illinois; Memphis, Tennessee; Dallas, Texas; and Kansas City, Missouri, in supporting the transportation of containerized goods from Asia through West Coast ports to the eastern United States.
Earthquake Spectra
This paper develops a two-stage stochastic program and solution procedure to optimize the selection of seismic retrofit strategies to increase the resilience of electric power systems against earthquake hazards. The model explicitly considers the range of earthquake events that are possible and, for each, an approximation of the distribution of damage experienced. This is important because electric power systems are spatially distributed and so their performance is driven by the distribution of component damage. We test this solution procedure against the nonlinear integer solver in LINGO 13 and apply the formulation and solution strategy to the Eastern Interconnection, where seismic hazard stems from the New Madrid seismic zone.
The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.
Currently, much of protection planning is conducted separately for each infrastructure and hazard. Limited funding requires a balance of expenditures between terrorism and natural hazards based on potential impacts. This report documents the results of a Laboratory Directed Research & Development (LDRD) project that created a modeling framework for investment planning in interdependent infrastructures focused on multiple hazards, including terrorism. To develop this framework, three modeling elements were integrated: natural hazards, terrorism, and interdependent infrastructures. For natural hazards, a methodology was created for specifying events consistent with regional hazards. For terrorism, we modeled the terrorists actions based on assumptions regarding their knowledge, goals, and target identification strategy. For infrastructures, we focused on predicting post-event performance due to specific terrorist attacks and natural hazard events, tempered by appropriate infrastructure investments. We demonstrate the utility of this framework with various examples, including protection of electric power, roadway, and hospital networks.
Abstract not provided.
IEEE Transactions on Power Systems
Abstract not provided.
Abstract not provided.
The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.
Abstract not provided.
Abstract not provided.
Proposed for publication in Journal of Global Optimization.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Proposed for publication in IEEE Transactions on Power Systems.
Abstract not provided.
Abstract not provided.
Abstract not provided.