Publications
Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order
This hypothetical order provides the requirements and instructions for the Springfield Processing Plant (SPP) Vehicle Gate and Entry Control Point (ECP) in the perimeter access building. The purpose of this post is to prevent the theft, sabotage or diversion of nuclear material (NM), control access and exit at the protected area, and to respond to emergencies according the SPP Guard Force (GF) Contingency Plan and as directed by a Guard Force Supervisor.