Publications

Publications / Other Report

Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern

Lum, Clinton C.; Lum, Clinton C.; Lum, Clinton C.

This report documents the installation of injection well TAV-INJ1 at the Technical Area-V (TA-V) Groundwater Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). The U.S. Department of Energy (DOE) and the management and operating contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this well installation report.