Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

Bandlow, Alisa B.; Durfee, Justin D.; Frazier, Christopher R.; Jones, Katherine A.; Gearhart, Jared L.

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.