Publications
Contingency Contractor Optimization Phase 3 Extension Quick Start Guide Contingency Contractor Optimization Tool - Engineering Prototype - Release 2.3
Bandlow, Alisa B.; Bandlow, Alisa B.; Adair, Kristin L.; Adair, Kristin L.; Durfee, Justin D.; Durfee, Justin D.; Frazier, Christopher R.; Frazier, Christopher R.; Gearhart, Jared L.; Gearhart, Jared L.; Nozick, Linda K.; Nozick, Linda K.
This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.