Publications
An estimate of Sandia resources for underground nuclear weapons effects testing
Bomber, Thomas M.; Bomber, Thomas M.; Zeuch, David H.
We conducted a study of the time and resources that would be required for Sandia National Laboratories to once again perform nuclear weapons effects experiments of the sort that it did in the past. The study is predicated on the assumptions that if underground nuclear weapons effects testing (UG/NWET) is ever resumed, (1) a brief series of tests (i.e., 2-3) would be done, and (2) all required resources other than those specific to SNL experiments would be provided by others. The questions that we sought to answer were: (1) What experiments would SNL want to do and why? (2) How much would they cost? (3) How long would they take to field? To answer these questions, we convened panels of subject matter experts first to identify five experiments representative of those that SNL has done in the past, and then to determine the costs and timelines to design, fabricate and field each of them. We found that it would cost $76M to $84M to do all five experiments, including 164 to 174 FTEs to conduct all five experiments in a single test. Planning and expenditures for some of the experiments needed to start as early as 5.5 years prior to zero-day, and some work would continue up to 2 years beyond the event. Using experienced personnel as mentors, SNL could probably field such experiments within the next five years. However, beyond that time frame, loss of personnel would place us in the position of essentially starting over.