Sandia Alert, March 15, 2024 • Sandia will resume normal operations at Kirtland Air Force Base on Saturday, March 16, at 5 a.m., following a power outage on the base. More info.
Search
Contact Us
Page • New Mexico Sandia National Laboratories, New MexicoP.O. Box 5800Albuquerque, NM 87185-(mail stop)* Non-mail deliveries:1515 Eubank SEAlbuquerque, NM 87123 California Sandia National Laboratories, CaliforniaP.O. Box 969Livermore, CA 94551-0969 Non-mail deliveries:7011 East AvenueLivermore, CA 94550 * All mail must contain an appropriate mail stop to ensure delivery. Contact Information New Mexico General...
Delayed start time at Sandia’s Albuquerque site, Nov. 7
Sandia Alert, November 6, 2024 • Due to inclement weather, Sandia’s Albuquerque site is implementing a delayed start time of 10 a.m. for all on-site members of the workforce on Thursday, Nov. 7. Unless necessary and approved by your manager, do not come to work before the start time. Monitor for updates regarding schedule changes, as...
Emergency Alerts
Page • .highlight-article { padding: 16px 16px 40px 16px; width: auto 100%; } .lower-btn { position: absolute; bottom: 10px; margin-top: 16px; } .highlight-title { font-size: .8em; } .list-view-block .highlight-title { font-size: 1.2em; } .news-slider-content { color: #212529 !important; } .highlight-next, .highlight-all, .highlight-prev { float: right; } .highlighted-returns { display: inline-block; vertical-align: top;...
Inclement weather 3 p.m. early release at Sandia’s Albuquerque, NM, site
Sandia Alert, January 4, 2024 • Due to inclement weather at the Albuquerque, NM, site, Sandia is releasing all on-site members of the workforce at 3 p.m. today, Thursday, Jan. 4. Expect delays, use extreme caution when driving and be patient when leaving the labs, as all workforce members are being released simultaneously. Remember, weather and...
Inclement weather delayed start time 10 a.m., at Sandia’s Albuquerque site
Sandia Alert, January 5, 2024 • Due to inclement weather, Sandia’s Albuquerque, NM, site is implementing a 10 a.m. start time for all on-site members of the workforce on Friday, Jan. 5. Unless absolutely necessary and approved by your manager, do not come to work before the start time. Check for schedule updates due to worsening...
Inclement weather delayed start time 9-10 a.m., at Sandia’s Albuquerque site
Sandia Alert, January 7, 2024 • Due to inclement weather, onsite members of the workforce at Sandia’s Albuquerque, NM, location should report between 9 a.m. and 10 a.m. on Monday, Jan. 8. Unless necessary and approved by your manager, do not come to work before 9 a.m. Check for schedule updates due to worsening weather conditions....
Power outage closure at Kirtland Air Force Base, March 15, 2024
Sandia Alert, July 2, 2024 • Due to a power outage on Kirtland Air force Base, Sandia’s Albuquerque, NM site will be closed today March 15, 2024 for all non-mission essential personnel. Do not come to work unless necessary and approved by your manager. If access to the base is necessary for critical infrastructure work, coordinate...
Privacy and Security
Page • Privacy Notice This notice applies to all visitors to websites under the control of National Technology and Engineering Solutions of Sandia, LLC.. Some websites associated with Sandia National Laboratories may provide more detailed privacy, security or disclaimer notices, in which case those notices take precedence over this notice. We collect...
Public Health Service Financial Conflict of Interest Policy
Page • 1.0 Policy 1.1 This policy intends to promote objectivity in research funded by Public Health Service (PHS) Agencies by establishing standards that provide a reasonable expectation that the design, conduct, and reporting of research performed under PHS contracts will be free from bias resulting from Sandia National Laboratories (Sandia) Investigators’...
Sandia National Laboratories: Exceptional Service in the National Interest
Page • Sandia study supports superior bits Compendium of geothermal bit behavior to help drive down drilling time Read More New centrifuge spins lasting partnership WETL celebrates completion of new centrifuge Read More Detecting battery failures quicker Sandia working to improve safety of electric vehicle batteries Read More Sandia tests heat shields...
Sandia Test Alert
Sandia Alert, December 19, 2024 • This is only a test
Sandia to resume normal operations on KAFB Saturday, March 16, at 5 a.m.
Sandia Alert, July 2, 2024 • Sandia will resume normal operations at Kirtland Air Force Base on Saturday, March 16, at 5 a.m., following a power outage on the base. Although power has been restored on base, KAFB is still working to restore various systems. The power outage did not directly impact Sandia facilities, infrastructure, or...
Site Directory
Page • There are 181 public subsites on the network. 75 Ways Sandia has Changed the Nation About Sandia Academic Research Security Program ADAPT Additive Manufacturing Advanced Simulation and Computing AEASuppliers Aidan Thompson ALEGRA Multiphysics Ali Pinar ASC Software Augmented, Virtual and Mixed Reality Autonomy Bert Debusschere Bioenergy Cybersecurity Workshop Biomechanics Biorefinery...
Update: Power Outage closure at Kirtland Air Force Base March 15, 2024
Sandia Alert, July 2, 2024 • Due to a power outage on Kirtland Air Force Base, Sandia’s Albuquerque, NM, site will be closed Friday, March 15, 2024. Although the power outage is not directly impacting on-base Sandia facilities, infrastructure, or networks, KAFB is being significantly impacted, and access is limited to essential personnel only. If access...